5450 39TH AVE W

April 2, 2008: Land Use Application to allow construction of a new 121 ft. by 4 ft. pier which includes a 76 ft. grated walkway, a 35 ft. gangway and a 10 ft. by 10 ft. grated float. Project also includes installation of nine steel piles, and one boatlift. Additionally, five cubic yards of cobble and gravel mix will be filled waterward of the existing bulkhead and sheet pilings will be installed landward of existing bulkhead.

May 9, 2018: Completed.