1341 N NORTHLAKE WAY

May 4, 2006: Shoreline Substantial Development Application to construct a 156.25 ft. long, 2,983 sq. ft. pier supported by new steel piling and construction of an 85 lineal ft. concrete ecology block bulkhead with 13 cubic yards of landfill. Project includes removal of a minimum of 60 to a maximum of 93 existing wooden piling, dolphins and in-water metal debris.

May 9, 2018: Completed.