1418 NW 65TH ST

June 14, 2007: Land use application to allow 10,430 cu.yds of grading to replace the existing natural turf with synthetic turf, rubberized track, asphalt paving and lawn at the existing athletic field (Ballard High School) in an environmentally critical area.

May 9, 2018: Completed.