5975 EAST MARGINAL WAY S

June 28, 2007: Shoreline Substantial Development to allow removal and replacement of a portion of the existing industrial ramp, conveyors, gravel barge off-load system, and steel pilings and towers. Project includes installation of a new sheetpile wall and removal of material that has accumulated below the existing ramp conveyor.

May 9, 2018: Completed.