8526 ROOSEVELT WAY NE

July 28, 2008: Land Use Application to replace existing 60 million gallon open-water reservoir with a buried 60 million gallon concrete reservoir in an environmentally critical area (Maple Leaf Reservoir). Existing reservoir to be demolished. Project includes 221,150 cu. yds. of grading. Determination of Non-significance prepared by Seattle Public Utilities.

May 4, 2009: Permits issued.