Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

701 S ORCHARD ST

March 20, 2009: Land Use Application to change the use from warehouse/manufacturing to salvage yard (86,257 sq. ft. total). Project includes installation of interior/exterior material sorting equipment, 14 ft. high security walls, surface repavement, construction of 200 sq. ft. gate house, an 87.5 ft. truck scale and a 300 lineal ft. connection to existing storm water drain system. Surface parking for 44 vehicles to be provided. Three buildings totaling 6,198 sq. ft. to be demolished.

July 7, 2010: Permits issued.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.