7814 8TH AVE S
June 11, 2009:
CANCELLED DUE TO INACTIVITY-NO REPLY FROM LETTER 3/17/15 rc
Shoreline Substantial Development to allow a storm water treatment system consisting of 700 lineal feet of underground piping with below and above grade filtration devices. Project includes 250 cu. yds. of grading, replacement of the existing 16 ft. height, 900 foot long perimeter fence with the addition of a 24 ft. height , 125 foot long noise barrier, the construction of five concrete slabs, two 500 gallon fuel tanks and a 90 foot long truck scale. Existing structures to remain.
Canceled.