4025 13TH AVE W

Feb. 10, 2011: 3016790. REVISION TO 3014048. See 3014048 project description, plus the following: Remove 2 floating docks and add a grated ramp, remove solid dock area and replace with a grated material, remove 35 creosote piles and install 29 steel piles, and construct a covered exterior entry and exit stair deck between the warehouse/dispatch center and dispatch center.

3014048, REVISED TO 3011726. Shoreline Substantial Development Application to allow a 2-story 6,910 sq.ft. addition to main dock warehouse (13,800 sq.ft. of remaining warehouse) for new marine dispatch center, change 2,250 sq.ft. of the main dock warehouse to marine dispatch center, and a 2,250 sq.ft. interior addition to the existing marine dispatch center (total marine dispatch center 11,410 sq.ft.). Existing marine dispatch center to be demolished. All accessory to an existing transportation facility in an ECA (Coastal Transportation, Inc).

3011726, ORIGINAL MUP. Shoreline Substantial Development Application to allow a new 2-story, 12,000 sq. ft. marine terminal dispatch center, accessory to an existing transportation facility in an environmentally critical area (Coastal Transportation, Inc). Parking for six vehicles to be relocated on the site.

May 9, 2018: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.