2430B 43RD AVE E
Aug. 16, 2011: SR 520 Replacement Project - Floating Bridge (Seattle Portion) Shoreline Substantial Development Permit to allow replacement of the existing floating bridge in an environmentally critical area. Proposed bridge will be 6 lanes wide, measure 21' in height from the water line to the top of the railing, and be 3,790 feet in length in the City of Seattle portion. Work includes 11,366 cu. yds. of grading. Project includes construction of a temporary 4 lane bridge. Environmental documents prepared by Washington State Department of Transportation (WSDOT) and the Federal Highway Administration.
July 21, 2014: Permits issued.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.