601 S MYRTLE ST
Feb. 8, 2012: Shoreline Substantial Development Application to grade 3,100 cu. yds. of material under wharf (2,100 cut, 1,000 fill (rip rap). Demolish timber south wharf (300 linear ft.), remove rubble rip rap and three timber dolphins and construct concrete and steel replacement wharf and install one steel dolphin. Remove fender piles at North wharf (137 linear ft.) and replace with steel pile fender system (Seattle Iron and Metals).
May 9, 2018: Completed.