1800 WESTLAKE AVE N
The purpose of the project is to construct and install the fire protection improvements required to meet the Seattle Fire Department (SFD) requirements for marina covered moorage within the City of Seattle. The project includes: 1) Installing fire draft curtains under the existing covered moorage roof as directed by the Seattle Fire Department (SFD); 2) Removing a portion of the existing covered moorage roof over Pier E as directed by SFD; 3) Upgrading the existing fire standpipe system for the marina as directed by SFD. All work will be located above the waterline.
Canceled.