Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

11764 RIVIERA PL NE

Feb. 22, 2017: To repair existing residential dock on Lake Washington. Replace framing and decking. Stringers to be 4" x 8" ACZA treated fir. Joists to be 6" x 8" ACZA treated fir. Worn wooden decking to be replaced with ThruFlow grated panels. Piles to be sleeved with HDPE sleeves/tubes as shown on plans. Boat house to be repaired as shown. Boat house cover to be replaced with plexiglass/translucent material (specifications available upon request).

Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.