6400 60TH PL S

Aug. 23, 2018: Shoreline Substantial Development Application to extend an existing 95 ft. pier to 170 ft., relocation of an existing boat slip and replacing existing wood decking with grated decking. Review includes replacement of existing bulkhead with a battered rock bulkhead creating a 740 sq. ft. gravel beach cove.

Oct. 1, 2021: Completed.