640 S RIVERSIDE DR

April 17, 2019: Shoreline Substantial Development application to allow a 1-story and 2-story building for a stormwater pump station (South Park Pump Station). Existing pier to be demolished and 7 pier piles to be cut down to sediment surface. Determination of Non-Significance prepared by Seattle Public Utilities.

Jan. 21, 2020: Permits issued.