3350 BEACH DR SW
May 3, 2019:
King County Wastewater Treatment division is proposing to install a permanent generator at the Alki treatment plant to provide standby power at the 63rd Ave SW pump station. Proposed work:
Install generator at the Alki Treatment Facility
Electrical upgrades needed at Alki
Building alterations
Install fuel tank at Alki
install conduit in ROW to connect to 63rd Ave pump station
Electrical connections at 63rd Ave SW
Canceled.