Feb. 26, 2020: Lehigh Hanson is proposing to repair existing shoreline infrastructure and address ongoing erosion issues along the shoreline that are collapsing portions of the existing dock and creating a significant safety hazard at the facility. The project includes debris removal, overwater cover removal, pier decking repair, piling and seawall replacement, and riprap bank repair.