Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

7225 LEDROIT CT SW

April 25, 2020: The project includes replacement and repair of existing timber walls west of the residence along with placement of continuations of the existing walls along the north-south alignment of the existing walls. The existing walls include 6-inch timbers with local cribbing (as tiebacks) and pipe piles along with railroad ties. The existing walls are locally leaning and are in need of repair. Figure 1 shows the location of the existing walls and proposed wall extensions. Figure 2 shows a generalized section through the property as well as a detail of the proposed pipe piles and timber lagging.

Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.