2130 HARBOR AVE SW

June 18, 2020: The existing site consists of 7 berthing dolphins (D-1 through D-7). Six of the existing berthing dolphins (D-2 through D-7) contain piles that have significantly deteriorated. Replacement of 20 of those piles is needed to maintain the industrial/commercial marine use of the berthing dolphins. Applicant is seeking shoreline exemption as normal maintenance and repair pursuant to SMC 23.60A.020 C1.

The City has issued a Pre-Application Site Visit Report for the adjacent Pier/upland (000727-20PA) in March 2020.

Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.