Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

2324 SHORELAND DR S

March 6, 2021: Requesting a Shoreline Exemption for Normal Maintenance or Repair of Existing Structure (SMC 23.60A.020.C1). Replace approximately 8 feet of sewer mainline with 8-inch-dia PVC pipe and reconnection of ~3 feet of 4-inch-dia lateral in the back yard of a private residential property. Approximately 40 CY of excavation/fill will occur with 16 CY of compost and 16 CY of arborist wood chip mulch. Area of disturbance (~1,710 SF) will be restored to existing conditions (lawn, landscaping, stone steps, and retaining wall.

Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.