2225 ALASKAN WAY

Oct. 1, 2021: Shoreline Substantial Development application to allow installation of electric cables, duct banks, meter switchgear infrastructure and vaults to connect submarine cable to an existing SCL power vault at T-46. Determination of Non-Significance prepared by Port of Seattle. To be considered with 3039224-LU.

Completed.