Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

3200 PORTAGE BAY PL E

July 22, 2021: Construction within the shoreline environment. Construct new ecology block retaining wall to reinforce existing concrete and timber retaining wall, which is failing. Proposed wall will be approximately 6' east of existing wall. Slope to be retained is currently partially supporting Portage Bay Place E.
Included in the scope of this permit will be the repair and maintenance of the existing street level carport. No expansion is proposed. Existing structure will be reinforced structurally as required, and re-roofed and re-sided.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.