4774 35TH AVE NE

Feb. 10, 2022: To modify an existing 1945 R-3 Residential structure (1960SQFT) into a PreSchool via an "E" Occupancy. This preschool will support a total of 28 children ages 2.5 to 5 years old and QTY (6) Staff Members. The structure is 2-stories and has a walk-out basement. Currently the basement is unfinished. Each floor will support a maximum of QTY (14) Students.