5241 EAST MARGINAL WAY S

Jan. 19, 2024: Power at Brandon St Outfall Station will be connected to the Brandon St Regulator Station. The existing generator at the outfall station will be removed and a new one will be installed at the regulator station in an outdoor enclosure with a concrete pad. Existing conduit will be used to connect the outfall and regulator stations, with a short run added at the Regulator Station. Grading is anticipated to be minimal.