Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1400 DISCOVERY PARK BLVD

Sept. 12, 2024: ***Full plan review required*** Expanded elevated platform (referred to as Mezzanine on figures) (30 x 84 ft, or 2520 sq ft) and new electrical building (22 x 38 ft, or 836 sq ft) are proposed at 705 Area of WPTP. Demolition will be limited to the east side of the existing Grit Building platform (referred to as Mezzanine on figures) (approx. 400 sq ft) and surface areas beneath existing platform (approx. 2700 sq ft). Disturbed surfaces will be restored. Stormwater from the new structure to be directed to existing collection system. New electrical building and elevated platform will be used for installation of mechanical equipment.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.