Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

3432 HARBOR AVE SW

Oct. 4, 2024: Install outdoor generator and concrete pad. Outdoor generator will have minimum 3-foot access clearance all around (with gates open on one side), will be anchored to a concrete pad installed on a new concrete slab area (140 SF; no net change in impervious surfaces). The generator slab will be surrounded by a security fence (chain-link with barbed wire) and include a sound attenuation wall on three sides. Existing fencing surrounding the parcel will be replaced (chain link, with barb wire on top). Existing on-site parking will remain but be reduced to one space with a new entry gate relocated slightly south. Minor grading will be done at the relocated entry drive with a small amount of pavement (30 SF) installed. Plans are to establish a temporary construction staging area (1,523 SF) to the east of the station parcel on Nucor property.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.