Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

6546 44TH AVE NE

Oct. 14, 2024: demolish, load, haul and dispose of existing hardscaped areas and existing rockery walls along driveways. Pump, rinse and remove existing residential heating oil tank. Install pin pile shoring. Excavate, load and dispose up to 1,140 tons of clean dry overburden material and stockpile if necessary. Slot cut excavation under existing foundations (Assumes 195 tons). Excavate, load and dispose of petroleum contaminated soil (PCS) to certified facility. Assumes up to 670 tons. Provide and place controlled density fill for work under existing foundations. Import, place and compact type 17 gravel borrow material (up to 900 tons). Import, place and compact crushed rock for new concrete subgrade (for driveways). Import place and grade 3-way topsoil. Assumes up to 50 CY. Concrete hardscape restoration for driveways. Purchase and construct redi-rock retaining walls. Purchase and install infiltration galleries noted on plans.

Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.