5511 15TH AVE S
Dec. 11, 2024: THE SCHOOL DISTRICT PROPOSES TO RE-ESTABLISH A WALKWAY CONNECTING THE EXISTING SCHOOL AND PARKING LOT WITH THE LOWER SPORTS FIELD COMPLEX TO ALLOW STUDENTS AND THE PUBLIC PEDESTRIAN ACCESS TO THE FIELD. A RAISED ACCESSIBLE WALKWAY CONNECTING THE ADJACENT PARKING LOT TO THE TRACK AND FIELD IS PROPOSED FOLLOWING APPROXIMATELY THE ROUTE OF THE EXISTING PATH. SEVERAL SWITCHBACK RAMPS ARE NEEDED TO PROVIDE AN ADA ACCESSIBLE PATHWAY. LOW IMPACT FOUNDATIONS SYSTEMS WILL BE PROPOSED USING A DIAMOND PIER OR SIMILAR PIN PILE FOOTING. BECAUSE THE EXISTING PATHWAY IS WITHIN A CRITICAL AREA STEEP SLOPE, THE RAMP SYSTEM IS DESIGNED TO CAUSE AS LITTLE DISTURBANCE TO THE SLOPE AND EXISTING TREES AS POSSIBLE.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.