3480 WEST MARGINAL WAY SW

Jan. 17, 2025: During the summer of 2023, contact between vessels and the pier facility operated by Pacific Terminals, Inc, sustained significant structural damage to the pier structure rendering a portion of it unusable for business purposes. The impact damaged two 14" fender piles, two HDPE chaffing plates and detached these pilings from the exisitng piling cap.

The damage has rendered approximately 20 lineal feet of the berth unusable for business. Repairs must be conducted as soon as possible to be included in the present fish window and minimize lost revenue.

Pacific Terminals is proposing to replace the following items at the Terminal 7 dock due to damage from a recent vessel impact;
-Pull and replace two existing damaged 14" fender timber piles with 14" steel or UHMW/HDPE or similar poly-coated timber pile
- Pull and replace two HDPE chaffing plates on newly installed fender piles
-Reattach all replaced pilings to replaced piling caps with galvanized hardware

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.