801 ALASKAN WAY
Feb. 17, 2026: Shoreline Substantial Development Application to allow installation of new electrical infrastructure for the operation of a new hybrid electric ferry fleet at the Seattle Ferry Terminal (Colman Dock). The project includes 2 vessel charging systems at the ferry terminal, electrical equipment on the Pier 48 uplands, 2 submarine electrical cables from the Pier 48 uplands to the ferry terminal, and 7 dolphins for vessel berthing. A portion of Pier 48 to be demolished. Determination of non-significance has been prepared by Washington State Ferries.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.