5051 BEACH DR SW
July 25, 2025: This LU application can be withdrawn by customer from the portal. Existing on-site is a 45 LF timber bulkhead. The bulkhead is in a deteriorating condition and a replacement is required. The proposed project is an in-kind 49 LF timber bulkhead replacement within the existing bulkhead footprint.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.