Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

6901 FOX AVE S

Jan. 10, 2026: The Project proposes to replace five dolphins constructed from clusters of approximately 20 12-inch timber piles each with six 30-inch-diameter steel piles in the LDW. One of the five existing dolphins was removed
due to pile failure. The six 30-inch steel pile dolphins are proposed in the same alignment as the existing dolphins.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.