6000 WEST MARGINAL WAY SW

March 13, 2026: The line of dolphins in their original condition consisted of six dolphins, each a combination of plumb and
batter pile clusters. In 2023, the northernmost dolphin failed and was replaced by a 30-inch-diameter steel
pile. The second dolphin from the north also failed and was removed, and then in November 2025, the third
dolphin from the north failed and was removed. The proposed Project replaces these two (removed dolphins
and removes and replaces the existing three southern dolphins with 30-inch steel piles in their approximate
historical locations.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.