Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

1220 WESTLAKE AVE N

April 3, 2026: Upland from the AGC marina would be an Aboveground Storage Tank (AST) used solely by a prime customer leasing multiple slips at the marina. Product line that would feed the hose stand/reel would be secured on retaining wall just above existing electrical conduit. Hose stand and reel are proposed to be within a lockable existing fenced in area below the access ramp. Existing fenced area above the shoreline is where the AST will be placed, it is outside of all required setbacks for a double wall AST; and existing asphalt will be cut out/removed with tank manufacturers specified footing plan.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.