Sept. 27, 2020: Installation of a 22'-6" x 23'-9" carport atop and existing concrete off alley parking space.
Currently their exists (8) 16"x16"x42" high masonry columns which the design calls for placing 6"x6" columns atop with a simple trellis type structure spanning the entire concrete parking area.