3501 NE 41ST ST
June 6, 2025: The project is a greenhouse-like structure that will be built on the UW Farm. The structure differs from a greenhouse because there is no poured concrete. It is considered a high tunnel because it is to be constructed over existing farmland. The structure is purchased off the shelf and consists of a 100-foot-long concrete wall on the north end, with zinc rods extending down from the wall to the ground. The rods will be covered with a thin film. The total structure is 30x100 feet with a max heig
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.