1400 W Lake Sammamish Pkwy NE

June 21, 2002: Bulkhead Wall Repair. Proposes to construct a concrete wall behind/landward of an existing nonconforming wood bulkhead which will remain in its current location and configuration. Purpose of the new wall is to prevent erosion problems. (wooden bulkhead located currently waterward of the OHWM)

Sept. 1, 2004: Completed.