July 30, 2002: Northup East/Bellevue. Install unmanned telecommunication facility consisting of two antennas, enclosed in 6 ft high accelerator, mounted to existing 35 ft light standard. Associated equipment located in vault encloser at base of pole within ROW
Utility Condition: Show all existing and proposed utilities on the plan sheet per Utility As-built Maps per Site Plan A Submittal Requirements.
A possible side sewer may be located through the site designated for the building and equipment. Use As-built maps to locate side sewer, and show on the plan sheet. If side sewer exists through site, do not place structures on or within 2' of side sewer.

Oct. 17, 2002: Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.