6007 Hazelwood Ln SE
Dec. 30, 2003:
Repair work on existing Dock/Bulkhead/Boatlift. Repair existing docks by replacing existing caps, stringers and decking.
Repair up to 6 piling as necessary. Reinforce existing bulkhead from behind to ensure structural integrity. Locate a new boatlift on the south side of the northern most dock, in conjunction with the removal of the existing boatlift on the north side of that same dock.
Dec. 25, 2004: Canceled.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.