Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

6007 Hazelwood Ln SE

Dec. 30, 2003: Repair work on existing Dock/Bulkhead/Boatlift. Repair existing docks by replacing existing caps, stringers and decking.
Repair up to 6 piling as necessary. Reinforce existing bulkhead from behind to ensure structural integrity. Locate a new boatlift on the south side of the northern most dock, in conjunction with the removal of the existing boatlift on the north side of that same dock.

Dec. 25, 2004: Canceled.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.