3218 W Lake Sammamish Pkwy SE

April 21, 2004: Dock Repair. Repair existing storm damaged pier. Replace storm removed platform, replace decking, repair caps and stringers, remove 32 piles. Footprint to stay the same. If pile repair is necessary, either double cap or sleeve with PVC and fill with concrete.

Jan. 7, 2005: Completed.