2668 W Lake Sammamish Pkwy SE

Sept. 12, 2006: Stanton Boat Lift / Pier / Decking. Repair existing pier; replace decking; remove and replace existing caps & stringers as needed. Install two piles; remove 67 SF of deck area; install free-standing portable boatlift. Includes clearing & grading. **06-123240 EA**

April 7, 2010: Completed.