5651 Pleasure Point Ln

June 25, 2007: Bulkhead Repair. Re-establish integrity to the existing concrete step bulkhead by addition of steel tie back beams imbedded behing the bulkhead and upland of OHW, with addition of gravel fill and filter fabric. Does not include plumbing, mechanical or electrical. Includes clearing and grading.

Sept. 30, 2008: Completed.