860 W Lake Sammamish Pkwy NE

Feb. 19, 2008: Pier. Application for Shoreline Substantial Development Permit on Lake Sammamish for the demolition of two solid-surface dock structures, two gangway ramps, two solid concrete piers and a concrete sidewalk adjacent to the OHWM, and new construction including a 476 square foot pier structure with a 100% grated surface and restoration of the removed concrete sidewalk area with native vegetation.

Jan. 5, 2009: Completed.