April 21, 2008: Northwest Bellevue NEP Pre-Ballot Polls. Preapp conference scheduled for 05/01/2008.Most of the projects listed are adjacent to existing roadways, within public right of way. Project #9 is on exisiting park land, The Chaplin property. These projects are either a proposed sidewalk, widened shoulder, or meandering asphalt path. These look like projects where the typical ROW permit (TC) or a combined ROW (with clear and grade review) would be needed. Are there additional permits needed? Are there any issues with exisiting untilites or upcoming utility projects that we need to be aware of?
June 17, 2008: Completed.