June 22, 2009: SE 24th Street (139th Ave SE - Kamber Road). Conference 7/8/2009 @ 1:30 am. Construct 5' wide concrete sidewalk, on the north side of SE 24th St, behind existing rolled curb.

July 1, 2009: Completed.