5227 Pleasure Point Ln

June 12, 2014: Kaiser Pier Repair. Repair existing piers. Repair caps and stringers as needed. Replace solid wood plank decking with thru flow grated decking. Piles to remain. Repair piles as needed by splicing. Replace like for like.

June 30, 2014: Completed.