Aug. 13, 2015: BOP - 3 way Bridge Repair (15-0026). A proposed bridge repair design to drive new pin piles, pour new concrete grade beams, and install new hollow core concrete planks from the existing bridge elevation down to a more stable elevation at the asphalt drive.
Aug. 27, 2015: Completed.
Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.