100 Cascade Ky

April 27, 2016: Lee CALUP. Demo and dispose of the existing deck, caps and stringers as well as 120 sq ft of the existing ELL and 2 wood piles. Drive seven treated wood piles. Construct a 171 sq ft ELL. Install ThruFlow grating over the entire pier. Drive (2) 12 inch steel mooring piles. Install a shoreline planting plan.

March 15, 2019: Completed.