10101 SE 30th St
Aug. 18, 2017: Walker Bulkhead Repair. Repair an existing rock bulkhead by restacking rocks and adding drainage material landward of the bulkhead. Remove and re-use existing fallen bulkhead rocks. Add 25 cubic yards of 2' minus spawning gravel mix along the shoreline.
March 8, 2018: Completed.
View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Download design proposal PDF.
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.