10101 SE 30th St

Aug. 18, 2017: Walker Bulkhead Repair. Repair an existing rock bulkhead by restacking rocks and adding drainage material landward of the bulkhead. Remove and re-use existing fallen bulkhead rocks. Add 25 cubic yards of 2' minus spawning gravel mix along the shoreline.

March 8, 2018: Completed.

View full design proposal: