3247 106th Ave SE
Dec. 11, 2017: Lyons Pier Repair & Boat Lifts. Repair existing pier, enlarging the 8'6" wide slip to 10'. The piles will be repaired as needed by sleeving with HDPE pipe and filling with concrete. Repair caps and stringers. Replace solid decking with grated decking. Pier size to be reduced by 36sf. Install boat lift and pier mounted PWC lift.
Jan. 30, 2020: Completed.
View full design proposal:

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.
Sign up for free calendar updates over email
Download design proposal PDF.
Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.