Seattle in Progress

Seattle in Progress

About Calendar Upgrade to Pro Sign In
  • About
  • Calendar
  • Upgrade to Pro
  • Sign In

Aug. 14, 2018: N Mercer Island and Enatai Interceptors Upgrade. Conf date 9/26/18 at 130 pm The proposed Project would: construct a new in-water interceptor via in-water open-cut and cover from Mercer Island Boat Launch to Enatai Beach Park located in the East Channel Crossing; install pipe to connect the East Channel Siphon to new siphon outlet and flow diversion structures, new odor control vaults and 5 maintenance holes in Enatai Beach Park; install new siphon pipeline using HDD between Enatai Beach Park and Sweyolocken Pump Station; rehabilitate existing pipeline located in Lake Washington from Enatai Beach Park to Sweylocken Pump Station with cured in place liner; install temporary by-pass system; replace existing pipe at the Enatai Beach Park Swim Beach; isolate angle structures located in-water and access maintenance holes located under 3 private docks for liner installation; and install 5 new maintenance holes at Sweyolocken Pump Station.

Nov. 15, 2019: Completed.

Start a free trial of our Pro Subscription to see additional project details, contact information, permit schedules and more.

Sign up for free calendar updates over email

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Filter by Project Status
Filter by Project Type

Start a free trial of our Pro Subscription to search by project type, size, permitting status, architect, developer and more.